MRP Engine
The Material Requirements Planning (MRP) Engine in PrismERP is a core component for optimizing inventory levels, production schedules, and procurement planning. It ensures the right materials are available at the right time in the right quantity to meet production demand while minimizing stock and reducing carrying costs.
Key Features
Automated Material Requirement Calculation
Calculates raw material requirements based on sales orders, production plans, or forecast demand.
Dynamic BOM Integration
Pulls data from the Bill of Materials to determine input materials per finished product.
Scheduling with Lead Times
Accounts for procurement lead times, work center capacities, and production cycles.
Procurement Suggestion Generation
Triggers material requisitions or purchase plans if required materials are not available in stock.
Inventory Check
Real-time stock validation to avoid over-purchasing or under-stocking.
Multi-Level MRP Run
Handles nested BOMs (subassemblies) and ensures availability across all levels.
Usage Guide in PrismERP
Prepare Master Data
- Ensure BOMs are properly configured.
- Define production plans or sales order forecasts.
- Update stock positions and item lead times.
Run MRP Engine
- Path: Production Planning MRP Engine
- Select planning horizon (date range).
- Choose demand sources (Sales Orders, Production Plans, Forecasts).
- Select output preference (Requisition or Purchase Proposal).
Review MRP Output
- View suggested quantities of required materials.
- See shortages, available stock, and proposed replenishments.
Execute Actions
- Convert suggestions to Material Requisitions or Purchase Orders.
- Send to procurement or warehouse for further processing.